Construction and Mounting Mining Project in Sierra Gorda.
The project was framed in everything necessary for the construction and installation of 3000 mts. of HDPE pipe
The project was framed in everything necessary for the construction and installation of 3000 mts. of HDPE pipe
The aim of the project was to carry out a modernization of the systems of receipt and dispensing of
The works of the project focused on the path of the conveyor belt that was installing Port a Colonel in the
The contract for “Civil Works And Electromechanical Assembly of Pump Stations # 3 And # 4 – Water Supply for Oxides
The main objective of the project “Construction Civil Works and Electromechanical Assembly Project DRLP”, involves the Assembly of two (2) pumps centrifugal
The Project considered the construction and installation of a new system of recirculation of the electrolyte between SX – Patio