
SIERRA GORDA SCM
Construction and Mounting Mining Project in Sierra Gorda.
The project was framed in everything necessary for the construction and installation of 3000 mts. of HDPE pipe

The project was framed in everything necessary for the construction and installation of 3000 mts. of HDPE pipe

The aim of the project was to carry out a modernization of the systems of receipt and dispensing of

The works of the project focused on the path of the conveyor belt that was installing Port a Colonel in the

The contract for “Civil Works And Electromechanical Assembly of Pump Stations # 3 And # 4 – Water Supply for Oxides

The main objective of the project “Construction Civil Works and Electromechanical Assembly Project DRLP”, involves the Assembly of two (2) pumps centrifugal

The Project considered the construction and installation of a new system of recirculation of the electrolyte between SX – Patio